Get a Quote

Chiller Cooling Tower Optimization

Large Chiller Systems tekWorx.

After adding up the two curves and obtaining the total cost curve the optimum approach is at the minimum point on that curveTherefore the system is optimized when it is operating at that pointThe approach controller TDIC1 in Figure 1 where TDIC stands for temperature difference indicating controller serves to maintain its setpoint SP1 by throttling the air fan speed to keep the approach at the optimum point.

Optimizing Centrifugal Chiller Systems 20170403.

Apr 03 2017nbsp018332Finding the holy grail of centrifugal chiller optimization for all operating conditions is hard if not impossibleThis article will talk about the requirements of most chiller systems and means of control for condenser optimizationThis method trends the kWton of the chiller cooling tower and condenser pump for given setpoints then.

An important component of a cooling tower loop is called a chillerMost people think that the cooling tower is solely responsible for providing the cooling necessary in an HVAC systemThe Chiller is and it’s often overlooked when it comes to optimizing a cooling system.

Chillers amp Cooling Tower Optimization 2122 Oct 2019 Hotel IstanaIPA Training is Registered withJAYASEELAN has about 30 years of experience in various industries.

Each chiller can be turned on off independently as desiredEach combination CW pump cooling tower can be turned on off independentlyThis tool provides several important functionsChiller Plant Optimizer™ program developmentOff site configuration of the CPO for a specific plant configuration.

Generally speaking the chiller will consume quite a bit more energy than the cooler tower pump and fans so when in doubt it pays to defer to what reduces the chiller loadBut in most systems running the cooling tower fans faster has a negative return at some point.

Jun 15 2005nbsp018332Cleanroom energy benchmarking data shows that chiller plant designs and operating efficiencies varied significantly from cleanroom to cleanroomWhile system optimization is critical to the overall energy efficiency of chiller plants the operating efficiency of chilled water and condenser pumps along with chiller efficiency and cooling tower.

One of the more recently developed optimization strategies is the modulation of condenser water temperature based on weather conditionsBecause chiller efficiency is directly affected by condenser water temperature cooler condenser water typically limited to approximately 60º F or 15ºC can improve chiller efficiency by as much as 15However this is at the cost of an incremental increase in cooling tower electric usage.

Production of chilled water is very important to many facilities as it is the common cooling medium typically used for air conditioning in commercial institutional and healthcare facilities  The chiller is the specific piece of equipment that cools water by transferring heat to refrigerant using a vaporcompression cycle  Although the main chiller byproduct is chilled water it also generates waste heat which needs to be removed to keep the chiller operating effectively.

Pump motors and cooling tower fan motors.

The chiller condenser water heat is often wasted through a cooling towerHeat recovery uses otherwise wasted heat to provide heat at the.

The chiller plant is usually consisted of chillers cooling towers condensing water pumps chilled water distribution pumps chil led water storage tanks and distribution pipesThe chillers in the plant can be connected in series or in parallelThe components that consume energy in the chiller plant include chiller com pressors cooling.

Chiller Plant Optimization A Case Study District Energy.

The load on a cooling tower depends on the flow and temperature of the water returning from the processThe controlled variable is the temperature of the cooling water that is sent back to the process and the manipulated variable is the air flow through the tower which can be changed either by adjusting the speed of variablespeed fans or by starting and stopping a number of constantspeed fans.

The operating cost of cooling tower operation is the sum of the energy costs of operating the cooling water pumps and the air fansOptimization minimizes the sum of these costsBecause both the pump and the fan are sized for the maximum process load and worst weather conditions operating them at full capacity when the load drops is wastefulTherefore it is desirable to use variablespeed pumps and fansIf the speeds of the pumps and fans are reduced from 100 to 80 their operating cost is cut in half and if their speeds are cut in half the operating cost drops to 15.

Theoretically chiller plant optimization can seem simplenbsp Practically speaking however experience shows that it can be really challengingChillers are an excellent case study for thisOn the chilled water evaporator side of a chiller optimization is ldquosimplerdquoAlthough it is easier said than done the most efficient operating point of the system should provide the highest supply and return temperatures possible to meet the cooling loadsHowever on the warm condenser side of the chiller optimization is usually difficult both on paper and in the field.

While small commercial chillers typically utilize localized cooling fans to remediate the waste heat larger more efficient chillers often use a condenser water system consisting of cooling towers and pumps to circulate water through the chiller.